Congress

2017’s Proposed HR 3043

Would have designated FERC as the lead agency for coordinating all federal authorizations and reviews related to hydropower license applications, and required FERC to establish a schedule for the reviewing applications.

2017’s Proposed S. 1460

Would have reformed the hydropower licensing and permitting program by statutorily designating FERC as the lead agency, and requiring FERC to set a centralized permitting schedule.

Resources on Industrial Symbiosis

Industrial symbiosis engages traditionally separate industries that seek competitive advantage through physical exchange of materials, energy, water, and byproducts.