Oregon’s H.B. 2785 encourages micro and small hydropower development by alleviating some of the costs associated with hydropower permitting. H.B. 2785 established an expedited water rights review process for certain small conduit hydropower projects with existing water rights, allowing them to apply for a change of use to operate small hydropower projects through an expedited process while not losing the priority date associated with their original water right.