California Distribution Resources Plan process

Required three major investor-owned utilities to identify optimal locations for the deployment of distributed resources.

Washington’s SB 5116

Grants the Utilities and Transportation Commission the authority to shift utilities from a return-on-capital business model to a performance-based model.

Ohio’s PowerForward Collaborative

An overarching grid modernization group led by Public Utility Commission staff.

Rhode Island’s Power Sector Transformation proceeding

Focused on developing utility business models, grid connectivity and functionality, distribution system planning, and beneficial electrification.

Minnesota Performance-Based Regulation proceeding

Phase one of a two-phase PBR process includes articulating goals, identifying desired outcomes, and specifying performance metrics.