San Jose’s building electrification reach code encourages all-electric construction by requiring any new building with gas to achieve higher energy-efficiency savings (Cal Green Tier 1 compliance) and be “electrification ready.” It will soon require all-electric new construction for new municipal buildings and new low-rise residential buildings. The code also requires greater access to electric vehicle charging for new construction.