Windsor’s all-electric reach code Pathway: Energy Efficiency, Conservation, and Fuel Switching in Buildings and Industry → New Buildings → Natural Gas Bans in New BuildingsJurisdiction: Local Governments Windsor CA adopted a reach code in September 2019 that mandates all-electric new construction for all new low-rise residential buildings. This includes single-family homes, multi-family below four stories, and detached accessory dwelling units.